Pumpman for Oil/Chemical Tanker, salary 3200 US
We are looking for Top 4 to take over 4 Oil/Chemical tankers in October/November 2019. Please see below details of vessels:
Chemical tankers:
MST – 13500 USD
C/E — 13000 USD
C/O + 2/E – 10500 USD
NOTE: All officers positions have re-joining bonus beginning 2nd trip.
VESSEL No.1
Flag | Denmark |
Port of registry | Herning |
GT | 5.706 t |
DWT | Summer: 7.902,9 tWinter: 7.634,7 t |
NT | 2.406 t |
Length | 101,39 m overall94,90 m between perpendiculars |
Breadth | 19,05 m |
Draught | 7,60 m |
Air draft | 29,87 m |
Freeboard | 2.911 mm |
Depth | 10,50 m |
Speed | 14,0 knots |
Built | 2010 |
Date of completion | 21.07.2010 |
Builder | Nantong Mingde Heavy Industry Stock Co.,Ltd. Tongzhou China |
Yard number | MD045-8000CT-07 |
Hull material | Steel |
Hull type | Double hull |
Watertight compartment | 61 |
Continuous decks | 1 |
Main engine | 1x Rolls Royce/Bergen 8L32/40 — 4 stroke 8 cylinder 320 x 400 mm diesel engine 4.000 kW / 5.435 hp at 750 rpmBuilder: Rolls-Royce Marine AS, Engines Dpt Bergen — Norway |
Propellers | 1x Screw propeller controllable pitch — aft at 167 rpm |
Boilers | 1x CHM Aalborg 133,00 m² / 9,0 bar 1x CHO Aalborg 49,90 m² / 9,0 bar |
Shaft generator | 1x 1.350 kVA — 1.080 kW |
Generators | 3x Scania / Nordhavn main diesel generatorsets each 525 kVA — 420 kW — 611 hp |
Emergency generator | 1x Diesel generatorset 124 kVA — 99 kW — 177 hp |
Bow thruster | 1x Nakashima 400 KW |
Number of cargo tanks | 10 |
Total capacity of tanks 98% | 9.252 m³ filling in 10cargo tanks (including 2 slop tanks) about 46,2 m³ at 98% filling each in 2 deck tanks |
Slop tanks | 2 |
Segregations | 5x Double valve segregations with 5 common lines |
Pumps | 11x Cargo pumps each 200 m³/h |
Loading rate | 2.000 m³/h |
Discharging rate | 1.000 m³/h |
Heating capacity | Steam heating, max load/discharge temp 80°C |
Manifolds | Manifold to main deck: 2.000 mmManifold to platform: 700 mm
Manifold to stern: 52,77 m Manifold to bow: 48,62 m Manifold to rail: 2.650 mm |
Tank capacities | Fuel oil: 742,1 m³Diesel oil: 54,9 m³
Ballast water: 3.290 m³ |
Lifting equipment | 1x Crane — SWL 3,0 t1x Crane — SWK 15,0 t |
Geographical Information
Geographical Information
VESSEL No.3
Classification | Top | |
---|---|---|
Main Class Symbols: | I Hull Mach | |
Service Notations: | Oil tanker ESP Chemical tanker ESP IMO TYPE 2 | |
Navigation Notations: | Unrestricted navigation | |
Additional Class Notation(s): | AVM-APS , AUT-UMS , CLEANSHIP 1 , INWATERSURVEY , IG | |
Machinery: |
|
|
Equipment: | 2(Ch 46 Q3) |
Dimension | Top |
---|---|
Gross Tonnage 69: | 5706 |
Net Tonnage 69: | 2406 |
Deadweight: | 7884 ton |
Overall Length: | 101.39 m |
LPP: | 94.9 m |
Breadth: | 19.05 m |
Depth: | 10.5 m |
Draught: | 7.6 m |
Freeboard: | 2911 mm |
Hull & Cargo | Top | ||
---|---|---|---|
Builder: | NANGTONG MINGDE HEAVY INDUSTRY STOCK CO.,LTD. | ||
Country of build: | CHINA | ||
Date of Build: | 15 Jan 2009 | ||
Yard N°: | MD041-8000DWT-03 | ||
Hull Material: | Steel | ||
Nb of Watertight Comp.: | 61 | ||
Number of Cont. Decks: |
|
||
Holds | |||
Total Capacity of Holds: | 0.00 | ||
Tanks | |||
Number of Tanks: | 12 | ||
Total Capacity of tanks: | 9252.7 m³ | ||
LBC: | 18982 |
Machinery | Top |
---|---|
Propelling Type: | Diesel |
Licence: | Bergen Engine |
Date of Build: | 01 Oct 2007 |
Builder: | Rolls-Royce Marine AS |
Place of Build (country): | Hordvikneset 125, 5108 Hordvik (NOR) |
Power and rating | |
Total Power (kW): | 4000 kW |
Total Power (HP): | 5435 HP |
Propelling machinery | |
Internal Combustion Engine: | (1) 4T — 8 cyl — 32.00 cm x 40.00 cm at 750 rpm |
Boilers | |
Boiler: | 1 CHM AALBORG 133.00 m² / 9.00 bar 1 CHO AALBORG 40.14 m² / 9.00 bar |
Electrical installation | |
Frequency: | 50 Hz |
Main Engine Driven Generators: | 1 — 1350 kVA — 1080 kW |
Diesel Generators: | 3 — 525 kVA — 420 kW — 611 HP |
Emergency Generators: | 1 — 124 kVA — 99 kW — 177 HP |
Propellers and propellershafts | |
Propelling system: | 1 Screw Propeller Controllable pitch LB (oil -closed) 5.00 at 167 rpm |
Speed of the ship | |
Speed: | 12 kn |
Capacity of bunkers | |
Fuel Capacity: | 606.2 m³ |
Geographical Information
VESSEL No.4
Classification | Top | |
---|---|---|
Main Class Symbols: | I Hull Mach | |
Service Notations: | Oil tanker ESP Chemical tanker ESP IMO TYPE 2 | |
Navigation Notations: | Unrestricted navigation | |
Additional Class Notation(s): | AVM-APS , AUT-UMS (SS) , CLEANSHIP 1 , INWATERSURVEY , IG (SS) | |
Machinery: |
|
|
Equipment: | 2(Ch 46 Q3) |
Dimension | Top |
---|---|
Gross Tonnage 69: | 5706 |
Net Tonnage 69: | 2278 |
Deadweight: | 7846 ton |
Overall Length: | 101.39 m |
LPP: | 94.9 m |
Breadth: | 19.05 m |
Depth: | 10.5 m |
Draught: | 7.4 m |
Freeboard: | 2911 mm |
Hull & Cargo | Top | ||
---|---|---|---|
Builder: | NANGTONG MINGDE HEAVY INDUSTRY STOCK CO.,LTD. | ||
Country of build: | CHINA | ||
Date of Build: | 10 Oct 2011 | ||
Yard N°: | MD046-8000CT-08 | ||
Hull Material: | Steel | ||
Nb of Watertight Comp.: | 66 | ||
Number of Cont. Decks: |
|
||
Tanks | |||
Number of Tanks: | 12 | ||
Total Capacity of tanks: | 9252.8 m³ | ||
LBC: | 18982 |
Machinery | Top |
---|---|
Propelling Type: | Diesel |
Licence: | Bergen |
Date of Build: | 03 May 2010 |
Builder: | Rolls-Royce Marine AS, Engines Dpt Bergen |
Place of Build (country): | Hordvikneset 125, 5108 Hordvik (NOR) |
Power and rating | |
Total Power (kW): | 4000 kW |
Total Power (HP): | 5435 HP |
Propelling machinery | |
Internal Combustion Engine: | (1) 4T — 8 cyl — 32.00 cm x 40.00 cm at 750 rpm |
Boilers | |
Boiler: | 1 CHM AALBORG 133.00 m² / 9.00 bar 1 CHO AALBORG 49.90 m² / 9.00 bar |
Electrical installation | |
Frequency: | 50 Hz |
Main Engine Driven Generators: | 1 — 1350 kVA — 1080 kW |
Diesel Generators: | 3 — 525 kVA — 420 kW — 611 HP |
Emergency Generators: | 1 — 124 kVA — 99 kW — 177 HP |
Propellers and propellershafts | |
Propelling system: | 1 Screw Propeller Controllable pitch LB (oil -closed) 5.00 at 167 rpm |
Speed of the ship | |
Speed: | 12 kn |
Capacity of bunkers | |
Fuel Capacity: | 594.08 m³ |
Geographical Information
Related posts