Pumpman for Oil/Chemical Tanker, salary 3200 US
We need 4th Engineer for Tanker, salary $3200. COE duration is 6 months.
| 1. | VESSEL DESCRIPTION | |||||
| 1.1 | Date updated: | Mar 23, 2016 | ||||
| 1.2 | Vessel’s name (IMO number): | |||||
| 1.3 | Vessel’s previous name(s) and date(s) of change: | Not Applicable | ||||
| 1.4 | Date delivered / Builder (where built): | Sep 25, 2006 / Guangzhou Shipyard Intl. China | ||||
| 1.5 | Flag / Port of Registry: | Singapore / Singapore | ||||
| 1.6 | Call sign / MMSI: | |||||
| 1.7 | Vessel’s contact details (satcom/fax/email etc.): | |||||
| 1.8 | Type of vessel (as described in Form A or Form B Q1.11 of the IOPPC): | Oil Tanker | ||||
| 1.9 | Type of hull: | Double Hull | ||||
| Classification | ||||||
| 1.10 | Classification society: | Lloyds Register | ||||
| 1.11 | Class notation: | +100A1Double Hull Oil Tanker, ESP, LI, SPM +LMC, IGS, UMS ShipRight (E, BWMP(S), SCM, VECS) | ||||
| 1.12 | Is the vessel subject to any conditions of class, class extensions, outstanding memorandums or class recommendations? If yes, give details: | N/A | ||||
| 1.13 | If classification society changed, name of previous and date of change: | DNV GL , Sep 02, 2015 | ||||
| 1.14 | IMO type, if applicable: | N/A | ||||
| 1.15 | Does the vessel have ice class? If yes, state what level: | No , Nil | ||||
| 1.16 | Date / place of last dry-dock: | Jun 22, 2014 / Setubal, Portugal | ||||
| 1.17 | Date next dry dock due / next annual survey due: | Sep 25, 2016 | ||||
| 1.18 | Date of last special survey / next special survey due: | Jul 01, 2011 | Sep 25, 2016 | |||
| 1.19 | If ship has Condition Assessment Program (CAP), what is the latest overall rating: | No , | ||||
| 1.20 | Does the vessel have a statement of compliance issued under the provisions of the Condition Assessment Scheme (CAS): If yes, what is the expiry date? | N/A Not Applicable |
||||
| Dimensions | ||||||
| 1.21 | Length overall (LOA): | 182.86 m | ||||
| 1.22 | Length between perpendiculars (LBP): | 174.50 m | ||||
| 1.23 | Extreme breadth (Beam): | 27.43 m | ||||
| 1.24 | Moulded depth: | 16.80 m | ||||
| 1.25 | Keel to masthead (KTM)/ Keel to masthead (KTM) in collapsed condition, if applicable: | 44.53 m | m | |||
| 1.26 | Bow to center manifold (BCM) / Stern to center manifold (SCM): | 91.16 m | 91.70 m | |||
| 1.27 | Distance bridge front to center of manifold: | 58.30 m | ||||
| 1.28 | Parallel body distances: | Lightship | Normal Ballast | Summer Dwt | ||
| Forward to mid-point manifold: | 33.80 m | 47.20 m | 91.16 m | |||
| Aft to mid-point manifold: | 37.40 m | 47.60 m | 90.7 m | |||
| Parallel body length: | 71.2 m | 94.8 m | 112.6 m | |||
| 1.29 | FWA/TPC at summer draft: | 258.00 mm | 46.8 MT | |||
| 1.30 | Constant (excluding fresh water): | 340 MT | ||||
| 1.31 | What is the company guidelines for Under Keel Clearance (UKC) for this vessel? | Thome OMD 011 states the following Ocean Passage — 20% of Dynamic Draft Fairways outside ports (Shallow waters) — 15% of Dynamic Draft Fairways inside ports (Within Port Limits) — 10% of Dynamic Draft Whilst alongside the berth — 10% of Static Draft Whilst at SBM/CBM moorings — 10% of Static Draft A lower UKC can be considered for Fairway inside port and during vessel stay at berth. For this Master need to ensure he follow the procedure as per below as mentioned in OMD 11. Vessels are required to inform Office if UKC computed is less than Thome under keel clearance criteria Under Keel Clearance computed is less than 2 metres (During Ocean Passage) Under Keel Clearance computed is less than 1 metres (During during Port approach, Pilotage / Port transit or at Anchorage / Alongside berth While informing Marine Department, the Vessels should include Completed TSM Form 002 If while deviating from Thomes requirement, still being in full compliance with the local government regulations, Masters to include a completed Risk Assessment highlighting the risk control measures that would need to be implemented in order to lower the risk to an acceptable value While evaluating the Vessels transit, the Marine Department are required to Confirm that the risk control measures noted in the Risk assessment are sufficient to reduce the risk Inform / Consult the Marine Manager or HSSEQ Manager and obtain his concurrence Office to Inform / Consult the Owners PIC and obtain his concurrence | ||||
| 1.32 | What is the max height of mast above waterline (air draft) | Full Mast | Collapsed Mast | |||
| Lightship: | 41.76 m | 0 m | ||||
| Normal ballast: | 37.00 m | 0 m | ||||
| At loaded summer deadweight: | 32.913 m | 0 m | ||||
| Tonnages | ||||||
| 1.33 | Net Tonnage: | 11098.00 | ||||
| 1.34 | Gross Tonnage / Reduced Gross Tonnage (if applicable): | 24048.00 | 18887 | |||
| 1.35 | Suez Canal Tonnage — Gross (SCGT) / Net (SCNT): | 25359.08 | 21583.24 | |||
| 1.36 | Panama Canal Net Tonnage (PCNT): | 20028.00 | ||||
| Ownership and Operation | ||||||
| 1.37 | Registered owner — Full style: | Denmark | ||||
| 1.38 | Technical operator — Full style: | Singapore | ||||
| 1.39 | Commercial operator — Full style: | Denmark | ||||
| 1.40 | Disponent owner — Full style: | Denmark | ||||
| 2. | CERTIFICATION | Issued | Last Annual | Expires | ||
| 2.1 | Safety Equipment Certificate (SEC): | Feb 19, 2016 | Sep 02, 2015 | Sep 24, 2016 | ||
| 2.2 | Safety Radio Certificate (SRC) | Sep 02, 2015 | Sep 02, 2015 | Sep 24, 2016 | ||
| 2.3 | Safety Construction Certificate (SCC): | Sep 02, 2015 | Sep 02, 2015 | Sep 24, 2016 | ||
| 2.4 | International Loadline Certificate (ILC): | Jun 25, 2014 | Jun 25, 2014 | Sep 25, 2016 | ||
| 2.5 | International Oil Pollution Prevention Certificate (IOPPC): | Sep 02, 2015 | Sep 02, 2015 | Sep 24, 2016 | ||
| 2.6 | ISM Safety Management Certificate (SMC): | Oct 31, 2014 | Sep 14, 2019 | |||
| 2.7 | Document of Compliance (DOC): | Jan 31, 2013 | Jan 26, 2016 | Jan 11, 2018 | ||
| 2.8 | USCG Certificate of Compliance (COC): | May 06, 2014 | May 06, 2015 | May 06, 2016 | ||
| 2.9 | Civil Liability Convention (CLC) 1992 Certificate: | Feb 20, 2016 | Feb 20, 2017 | |||
| 2.10 | Civil Liability for Bunker Oil Pollution Damage Convention (CLBC) Certificate: | Feb 16, 2016 | Feb 20, 2017 | |||
| 2.11 | Ship Sanitation Control (SSCC)/Ship Sanitation Control Exemption (SSCE) Certificate: | |||||
| 2.12 | U.S. Certificate of Financial Responsibility (COFR): | Apr 16, 2017 | Apr 16, 2017 | |||
| 2.13 | Certificate of Class (COC): | Aug 19, 2011 | Sep 02, 2015 | Sep 25, 2016 | ||
| 2.14 | International Sewage Pollution Prevention Certificate (ISPPC): | Sep 02, 2015 | Sep 24, 2016 | |||
| 2.15 | Certificate of Fitness (COF): | Not Applicable | Not Applicable | Not Applicable | ||
| 2.16 | International Energy Efficiency Certificate (IEEC): | |||||
| 2.17 | International Ship Security Certificate (ISSC): | Sep 14, 2014 | Sep 14, 2019 | |||
| 2.18 | International Air Pollution Prevention Certificate (IAPPC): | Sep 02, 2015 | Sep 02, 2015 | Sep 24, 2016 | ||
| 2.19 | Maritime Labour Certificate (MLC): | Oct 31, 2014 | Sep 14, 2019 | |||
| Documentation | ||||||
| 2.20 | Owner warrant that vessel is member of ITOPF and will remain so for the entire duration of this voyage/contract: | Yes | ||||
| 2.21 | Does vessel have in place a Drug and Alcohol Policy complying with OCIMF guidelines for Control of Drugs and Alcohol Onboard Ship? | Yes | ||||
| 2.22 | Is the ITF Special Agreement on board (if applicable)? | |||||
| 2.23 | ITF Blue Card expiry date: | Not Applicable | ||||
| 3. | CREW MANAGEMENT | |||||
| 3.1 | Nationality of Master: | Croatian | ||||
| 3.2 | Number and Nationality of Officers: | 8 Filipino, Montenegrin, Turkish, Croatian |
||||
| 3.3 | Number and Nationality of Crew: | 12 Filipino |
||||
| 3.4 | What is the common working language onboard: | English | ||||
| 3.5 | Do officers speak and understand English: | Yes | ||||
| 3.6 | If Officers/Crew employed by a Manning Agency — Full style: | Officers: Singapore Crew: Philippines |
||||
| 4. | FOR USA CALLS | |||||
| 4.1 | Has the vessel Operator submitted a Vessel Spill Response Plan to the US Coast Guard which has been approved by official USCG letter? | Yes | ||||
| 4.2 | Qualified individual (QI) — Full style: | Compliance Systems, Inc. Hamilton House, 26E Bryan Street, Savannah, Georgia 31401 USA |
||||
| 4.3 | Oil Spill Response Organization (OSRO) — Full style: | National Response Corporation 3500 Sunrise High, Suite T103, Great River, NY 11739 |
||||
| 5. | CARGO AND BALLAST HANDLING | |||||
| Double Hull Vessels | ||||||
| 5.1 | Is vessel fitted with centerline bulkhead in all cargo tanks? If Yes, solid or perforated: | Yes , Solid | ||||
| Loadline Information | ||||||
| 5.2 | Loadline | Freeboard | Draft | Deadweight | Displacement | |
| Summer: | 5.21 m | 11.617 m | 38492.00 MT | 47849.00 MT | ||
| Winter: | 5.47 m | 11.38 m | 37371.00 MT | 46728.00 MT | ||
| Tropical: | 4.98 m | 11.86 m | 39616.00 MT | 48974.00 MT | ||
| Lightship: | 14.08 m | 2.77 m | 9357.15 MT | |||
| Normal Ballast Condition: | 9.84 m | 7.00 m | 17814.00 MT | 27171.00 MT | ||
| 5.3 | Does vessel have multiple SDWT? If yes, please provide all assigned loadlines: | Yes | ||||
| Cargo Tank Capacities | ||||||
| 5.4 | Number of cargo tanks and total cubic capacity (98%): | 12, 6 each side | 37963.17 m3 | |||
| 5.5 | Capacity (98%) of each natural segregation with double valve (specify tanks): | Seg#1: 6395.89 m3 (p&s 1) Seg#2: 15325.63 m3 (p&s 2 and sloptanks p&s) Seg#3: 7306.28 m3 (p&s 3) Seg#4: 7306.28 m3 (p&s 4) Seg#5: 7291.13 m3 (p&s 5) Seg#6: 5662.09 m3 () |
||||
| 5.6 | Number of slop tanks and total cubic capacity (98%): | 5662.04 m3 | ||||
| 5.7 | Specify segregations which slops tanks belong to and their capacity with double valve: | |||||
| 5.8 | Residual/Retention oil tank(s) capacity (98%), if applicable: | 119.24 m3 | ||||
| 5.9 | Does vessel have Segregated Ballast Tanks (SBT) or Clean Ballast Tanks (CBT): | SBT | ||||
| SBT Vessels | ||||||
| 5.10 | What is total SBT capacity and percentage of SDWT vessel can maintain? | 17316.00 m3 | 46 % | |||
| 5.11 | Does vessel meet the requirements of MARPOL Annex I Reg 18.2: | Yes | ||||
| Cargo Handling and Pumping Systems | ||||||
| 5.12 | How many grades/products can vessel load/discharge with double valve segregation: | 5 | ||||
| 5.13 | Are there any cargo tank filling restrictions? If yes, specify number of slack tanks, max s.g., ullage restrictions etc.: |
N/A Not Applicable |
||||
| 5.14 | Pumps: | No. | Type | Capacity | At What Head (sg=1.0) | |
| Cargo Pumps: | 10 2 1 |
Centrifugal Centrifugal Centrifugal |
540 M3/HR 300 M3/HR 70 M3/HR |
130 Meters 130 Meters 60 Meters |
||
| Cargo Eductors: | N/A | m3/hr | m | |||
| Stripping: | N/A | m3/hr | m | |||
| Ballast Pumps: | 2 | Centrifugal | 1000 m3/hr | 25 m | ||
| Ballast Eductors: | 1 | Water Driven | 80 m3/hr | 25 m | ||
| 5.15 | Max loading rate for homogenous cargo per manifold connection: | 1724 m3/hr | ||||
| 5.16 | Max loading rate for homogenous cargo loaded simultaneously through all manifolds: | 3240.00 m3/hr | ||||
| 5.17 | How many cargo pumps can be run simultaneously at full capacity: | 6 | ||||
| Cargo Control Room | ||||||
| 5.18 | Is ship fitted with a Cargo Control Room (CCR): | Yes | ||||
| 5.19 | Can tank innage / ullage be read from the CCR: | Yes | ||||
| Gauging and Sampling | ||||||
| 5.20 | Can cargo be transferred under closed loading conditions in accordance with ISGOTT 11.1.6.6? | Yes | ||||
| 5.21 | What type of fixed closed tank gauging system is fitted: | Radar | ||||
| 5.22 | Number of portable gauging units (example- MMC) on board: | 3 | ||||
| 5.23 | Are overfill (high) alarms fitted? If Yes, indicate whether to all tanks or partial: | Yes , All | ||||
| 5.24 | Are cargo tanks fitted with multipoint gauging? If yes, specify type and locations: | , | ||||
| 5.25 | Is gauging system certified and calibrated? If no, specify which ones are not calibrated: | Yes , | ||||
| Vapor Emission Control System (VECS) | ||||||
| 5.26 | Is a Vapour Emission Control System (VECS) fitted? | Yes | ||||
| 5.27 | Number/size of VECS manifolds (per side): | 2 | 300 mm | |||
| 5.28 | Number / size / type of VECS reducers: | |||||
| Venting | ||||||
| 5.29 | State what type of venting system is fitted: | High Velocity PV Valves | ||||
| Cargo Manifolds and Reducers | ||||||
| 5.30 | Does vessel comply with the latest edition of the OCIMF ‘Recommendations for Oil Tanker Manifolds and Associated Equipment’? | Yes | ||||
| 5.31 | Total number / size of cargo manifold connections on each side: | 5 / 350.00 mm | ||||
| 5.32 | What type of valves are fitted at manifold: | Butterfly | ||||
| 5.33 | What is the material/rating of the manifold: | Carbon steel SCH 80 / | ||||
| 5.34 | Does the vessel have a Common Line Manifold connection? If yes, describe: | |||||
| 5.35 | Distance between cargo manifold centers: | 2010.00 mm | ||||
| 5.36 | Distance ships rail to manifold: | 4300.00 mm | ||||
| 5.37 | Distance manifold to ships side: | 4600.00 mm | ||||
| 5.38 | Top of rail to center of manifold: | 600.00 mm | ||||
| 5.39 | Distance main deck to center of manifold: | 1950.00 mm | ||||
| 5.40 | Spill tank grating to center of manifold: | 900.00 mm | ||||
| 5.41 | Manifold height above the waterline in normal ballast / at SDWT condition: | 12.20 m | 7.16 m | |||
| 5.42 | Number / size / type of reducers: | 10 x 350/400mm (14/16″) 4 x 350/300mm (14/12″) 4 x 350/250mm (14/10″) 4 x 350/200mm (14/8″) 1 x 250/150mm (10/6″) ANSI |
||||
| 5.43 | Is vessel fitted with a stern manifold? If yes, state size: | No , mm | ||||
| Heating | ||||||
| 5.44 | Cargo / slop tanks fitted with a cargo heating system? | Type | Coiled | Material | ||
| Cargo Tanks | Heating Coils | Yes | SS | |||
| Slop Tanks: | Heating Coils | Yes | ||||
| 5.45 | Maximum temperature cargo can be loaded / maintained: | 73.0 C / 163.4 F | 57 C / 134.6 F | |||
| 5.46 | Minimum temperature cargo can be loaded / maintained: | |||||
| Coating / Anodes | ||||||
| 5.47 | Tank Coating | Coated | Type | To What Extent | Anodes | |
| Cargo tanks: | Yes | Hempadur Pure Epoxy 15500 | Whole Tank | No | ||
| Ballast tanks: | Yes | Epoxy | Whole | Yes | ||
| Slop tanks: | Yes | Pure Epoxy | Whole Tank | |||
| 6. | INERT GAS AND CRUDE OIL WASHING | |||||
| 6.1 | Is a Crude Oil Washing (COW) installation fitted / operational? | Yes / Yes | ||||
| 6.2 | Is an Inert Gas System (IGS) fitted / operational? | Yes / Yes | ||||
| 6.3 | Is IGS supplied by flue gas, inert gas (IG) generator and/or nitrogen: | IG Generator | ||||
| 7. | MOORING | |||||
| 7.1 | Wires (on drums) | No. | Diameter | Material | Length | Breaking Strength |
| Forecastle: | mm | Not Applicable | m | MT | ||
| Main deck fwd: | mm | Not Applicable | m | MT | ||
| Main deck aft: | mm | Not Applicable | m | MT | ||
| Poop deck: | mm | Not Applicable | m | MT | ||
| 7.2 | Wire tails | No. | Diameter | Material | Length | Breaking Strength |
| Forecastle: | mm | Not Applicable | m | MT | ||
| Main deck fwd: | mm | Not Applicable | m | MT | ||
| Main deck aft: | mm | Not Applicable | m | MT | ||
| Poop deck: | mm | Not Applicable | m | MT | ||
| 7.3 | Ropes (on drums) | No. | Diameter | Material | Length | Breaking Strength |
| Forecastle: | 4 | 56.00 mm | Polyester/PP | 220.00 m | 58.00 MT | |
| Main deck fwd: | 2 | 56.00 mm | Polyester/PP | 220.00 m | 58.00 MT | |
| Main deck aft: | 2 | 56.00 mm | Polyester/PP | 220.00 m | 58.00 MT | |
| Poop deck: | 4 | 56.00 mm | Polyester/PP | 220.00 m | 58.00 MT | |
| 7.4 | Other lines | No. | Diameter | Material | Length | Breaking Strength |
| Forecastle: | 2 | 56.00 mm | Polyester/PP | 220.00 m | 58.00 MT | |
| Main deck fwd: | mm | Not Applicable | m | MT | ||
| Main deck aft: | mm | Not Applicable | m | MT | ||
| Poop deck: | 2 | 56.00 mm | Polyester/PP | 220.00 m | 59.50 MT | |
| 7.5 | Winches | No. | No. Drums | Motive Power | Brake Capacity | Type of Brake |
| Forecastle: | 2 | Double Drums | Hydraulic | 32.00 MT | ||
| Main deck fwd: | 1 | Double Drums | Hydraulic | 32.00 MT | ||
| Main deck aft: | 1 | Double Drums | Hydraulic | 32.00 MT | ||
| Poop deck: | 2 | Double Drums | Hydraulic | 32.00 MT | ||
| 7.6 | Bitts, closed chocks/fairleads | No. Bitts | SWL Bitts | No. Closed Chocks | SWL Closed Chocks | |
| Forecastle: | 4 | 64 MT | 5 | 54 MT | ||
| Main deck fwd: | 4 | 45 MT | 12 | 45 MT | ||
| Main deck aft: | 2 | 49 MT | 10 | 45 MT | ||
| Poop deck: | 6 | 64 MT | 7 | 54 MT | ||
| Anchors/Emergency Towing System | ||||||
| 7.7 | Number of shackles on port / starboard cable: | 11 / 12 | ||||
| 7.8 | Type / SWL of Emergency Towing system forward: | Tongue style | 200 MT | |||
| 7.9 | Type / SWL of Emergency Towing system aft: | ETS | 100 MT | |||
| Escort Tug | ||||||
| 7.10 | What is size / SWL of closed chock and/or fairleads of enclosed type on stern: | 600 | 100.00 MT | |||
| 7.11 | What is SWL of bollard on poop deck suitable for escort tug: | 100.00 MT | ||||
| Bow/Stern Thruster | ||||||
| 7.12 | What is brake horse power of bow thruster (if fitted): | Yes , 1020.00 bhp | ||||
| 7.13 | What is brake horse power of stern thruster (if fitted): | No , bhp | ||||
| Single Point Mooring (SPM) Equipment | ||||||
| 7.14 | Does the vessel meet the recommendations in the latest edition of OCIMF ‘Recommendations for Equipment Employed in the Bow Mooring of Conventional Tankers at Single Point Moorings (SPM)’? | Yes | ||||
| 7.15 | If fitted, how many chain stoppers: | 1 | ||||
| 7.16 | State type / SWL of chain stopper(s): | Tongue Type chain stopper | 200.00 MT | |||
| 7.17 | What is the maximum size chain diameter the bow stopper(s) can handle: | 76.00 mm | ||||
| 7.18 | Distance between the bow fairlead and chain stopper/bracket: | 3200.00 mm | ||||
| 7.19 | Is bow chock and/or fairlead of enclosed type of OCIMF recommended size (600mm x 450mm)? If not, give details of size: | Yes Not Applicable |
||||
| Lifting Equipment | ||||||
| 7.20 | Derrick / Crane description (Number, SWL and location): | Cranes: 1 x 10.00 Tonnes center |
||||
| 7.21 | What is maximum outreach of cranes / derricks outboard of the ship’s side: | 6.80 m | ||||
| Ship To Ship Transfer (STS) / Helicopter Operations | ||||||
| 7.22 | Does vessel comply with recommendations contained in OCIMF/ICS Ship To Ship Transfer Guide (Petroleum, Chemicals or Liquified Gas, as applicable)? | Yes | ||||
| 7.23 | Can the ship comply with the ICS Helicopter Guidelines? If Yes, state whether winching or landing area provided and diameter of the circle provided: | No , 5 m |
||||
| 8. | MISCELLANEOUS | |||||
| Engine | ||||||
| 8.1 | Speed | Maximum | Economic | |||
| Ballast speed: | 15.6 Kts (WSNP) | Kts (WSNP) | ||||
| Laden speed: | 14.5 Kts (WSNP) | Kts (WSNP) | ||||
| 8.2 | What type of fuel is used for main propulsion / generating plant: | HFO | HFO | |||
| 8.3 | Type / Capacity of bunker tanks: | Fuel Oil: 1148.19 m3 Diesel Oil: 346.91 m3 Gas Oil: 0 m3 |
||||
| 8.4 | Is vessel fitted with fixed or controllable pitch propeller(s): | Fixed | ||||
| 8.5 | Engines | No | Capacity | Make/Type | ||
| Main engine: | Kw | |||||
| Aux engine: | 3 | Kw | ||||
| Power packs: | m3 | |||||
| Boilers: | 1 | 18.00 MT/Hr | ||||
| Emissions | ||||||
| 8.6 | Main engine IMO NOx emission standard: | |||||
| 8.7 | Energy Efficiency Design Index (EEDI) rating number: | |||||
| Insurance | ||||||
| 8.8 | P & I Club — Full Style: | NORTH OF ENGLAND The Quayside, Newcastle upon Tyne, NE1 3DU UK. Tel: Fax: +44 191 261 0540 Email: general@nepia.com Web: www.nepia.com |
||||
| 8.9 | P & I Club pollution liability coverage / expiration date: | 1000000000 US$ | Feb 20, 2017 | |||
| 8.10 | Hull & Machinery insured by — Full Style: | |||||
| 8.11 | Hull & Machinery insured value / expiration date: | 44000000 US$ | Dec 31, 2016 | |||
| Recent Operational History | ||||||
| 8.12 | Date and place of last Port State Control inspection: | Jan 27, 2016 / Yangpu | ||||
| 8.13 | Any outstanding deficiencies as reported by any Port State Control? If yes, provide details: | No N/A |
||||
| 8.14 | Has vessel been involved in a pollution, grounding, serious casualty or collision incident during the past 12 months? If yes, full description: | Pollution: No , N/A Grounding: No , N/A Casualty: No , N/A Collision: No , N/A |
||||
| 8.15 | Last three cargoes / charterers / voyages (Last / 2nd Last / 3rd Last): | |||||
| 8.16 | Date/place of last STS operation: | |||||
| Vetting | ||||||
| 8.17 | Date of last SIRE inspection: | Mar 09, 2016 | ||||
| 8.18 | Date of last CDI inspection: | Not Applicable | ||||
| 8.19 | Recent Oil company inspections/screenings (To the best of owners knowledge and without guarantee of acceptance for future business)*:
*«Approvals» are not given by Oil Majors and ships are accepted for the voyage on a case by case basis. |
Contact owner for details. | ||||
| Additional Information | ||||||
| 8.20 | Additional information relating to features of the ship or operational characteristics: | |||||
Related posts






